top of page

Boligee Barge/Truck Loading Terminal

Boligee, AL

Cover.JPG

Project Description: 

This new construction consisted of constructing 5 each – new site-built tanks (gasoline and diesel) with a total capacity of 523,800-BBLs, a 4,500 GPM barge loading facility, a 3-lane truck loading facility, 16” twin pipeline receipt manifolds, and setting 7 each – 1,000-gallon factory-built aboveground additive tanks. Other work as the Prime Contractor included all associated civil, electrical, coating, and tank work.

15,000 ft Carbon Steel
Piping
New Facility Piping
Project Type

© 2025 Talon Industries, Inc.

  • LinkedIn
bottom of page