top of page

Bridgetex Colorado City

Crude Oil Terminal

Colorado City, TX

Cover.JPG

Project Description: 

This new construction consisted of the installation of carbon steel piping, with sizes ranging from 12” through 24”, to 4 new site-built tanks. This work included the installation of 24” receipt and transfer manifolds with almost 100 valves 12” and larger throughout the project. Other work performed includes setting 2 each – 8,900 GPM vertical can pumps and multiple structural pipe crossover walkways.

Bulk Storage Facility Piping
Project Type
9,400 ft Carbon Steel
Piping
  1. I'm an image title

    Describe your image here.

  2. I'm an image title

    Describe your image here.

  3. I'm an image title

    Describe your image here.

  4. I'm an image title

    Describe your image here.

  5. I'm an image title

    Describe your image here.

  6. I'm an image title

    Describe your image here.

  7. I'm an image title

    Describe your image here.

  8. I'm an image title

    Describe your image here.

  9. I'm an image title

    Describe your image here.

  10. I'm an image title

    Describe your image here.

  11. I'm an image title

    Describe your image here.

  12. I'm an image title

    Describe your image here.

  13. I'm an image title

    Describe your image here.

© 2025 Talon Industries, Inc.

  • LinkedIn
bottom of page