Bridgetex Colorado City
Crude Oil Terminal
Colorado City, TX
Project Description:
This new construction consisted of the installation of carbon steel piping, with sizes ranging from 12” through 24”, to 4 new site-built tanks. This work included the installation of 24” receipt and transfer manifolds with almost 100 valves 12” and larger throughout the project. Other work performed includes setting 2 each – 8,900 GPM vertical can pumps and multiple structural pipe crossover walkways.
Bulk Storage Facility Piping
Project Type
9,400 ft Carbon Steel
Piping