top of page

Shipper Tanks - Clearbrook Terminal

Clearbrook, MN

Project Description: 

This addition to an existing tank farm facility included the installation of carbon steel piping, with sizes ranging from 16” through 36”, to 4 new site-built tanks to expand the existing capacity. Other work performed includes 20”and 16" stopple procedures, installation of over 80 valves sizes 16” through 30”, and setting 6 each – 10,500 GPM vertical can pumps.   

Cover.JPG
14,600 ft  Carbon Steel 
Piping
Bulk Storage Facility Piping
Project Type